Quality checks (quality inspection)
A Quality Inspection records a check on an item: what you tested, the readings, and whether the item is Accepted or Rejected. Food producers use it for incoming ingredients and for each finished batch.
Before you start
- Agree with your quality team which items need checks and what the limits are.
- Your consultant sets what OLY ERP does when a check is missing or rejected (warn or stop).
Steps
Set up a template (once per type of check)
- Search for Quality Inspection Template and click + Add.
- Enter a name, for example "Corn grits - incoming".
- Add a row for each Parameter, for example "Moisture". Parameters you have not used before must first be created as a Quality Inspection Parameter.
- For a measured value, tick Numeric and enter Minimum Value and Maximum Value, for example 10 and 14 (%).
- For a yes/no check (for example "Smell normal"), leave Numeric unticked and enter the Acceptance Criteria Value, for example "Yes".
- Click Save.
Tell OLY ERP which items need checks
- Open the Item and go to the Quality section.
- For raw materials, tick Inspection Required before Purchase. For products you sell, you can tick Inspection Required before Delivery.
- Choose the Quality Inspection Template.
- For checks after production, open the product's BOM, tick Quality Inspection Required and choose the template.
- Click Save.
Check incoming raw materials
- Abebe saves the Purchase Receipt as a draft (do not submit yet).
- Click Create > Quality Inspection(s) and pick the items to check.
- The quality officer enters the Sample Size, the Batch No and the readings.
- OLY ERP sets each reading and the overall Status to Accepted or Rejected.
- Click Save, then Submit. Then submit the purchase receipt.
Check finished goods
- After Finish on the work order, save the Manufacture stock entry as a draft.
- Because the BOM asks for a check, the stock entry has Inspection Required ticked. Click Create > Quality Inspection(s) and pick the finished good.
- Enter the readings for the batch, for example pack weight, seal strength, taste.
- Submit the inspection, then submit the stock entry.
Good to know
- A rejected lot should not go into production or to customers. Move it to "Rejected - EF" and record what you decide.
- Take readings from real samples on the day. Do not type the limits as readings.
- The Quality Inspection Summary report lists inspections and their results for a period.
- Keep templates simple: 3 to 6 parameters people really measure.
Related
Last updated 1 week ago
Was this helpful?